Building Regs Drawings - Apex Planning & Development

Technical Documentation

Building Regulations Drawings

Detailed technical drawing packages that satisfy Building Control requirements — giving your builder and structural engineer everything needed to start work with confidence.

5-10 Day Turnaround
98% First-Pass Approval
Fixed Fee Guaranteed
Building Regulations Drawings

What It Involves

Building Regulations Drawings That Give Your Builder Everything They Need

Planning permission tells you what you can build. Building Regulations approval tells you how you must build it. The technical drawing package is the bridge between design intent and compliant construction.

Our packages cover all relevant Parts of the Regulations: structural adequacy (Part A), fire safety (Part B), thermal performance (Part L), drainage (Part H), ventilation (Part F) and accessibility (Part M).

We work closely with your contractor and specialist consultants to ensure the technical package is practical to build, meets all regulatory requirements, and minimises queries from Building Control.

Who This Is For

Homeowners who have planning permission and need Building Control approval

Builders and contractors requiring detailed technical drawings before pricing

Developers needing a full technical package coordinated with structural consultants

Clients self-managing a build who need drawings to obtain contractor quotes

What’s Included

A complete, fixed-fee package — no hidden extras.

Existing & Proposed Floor Plans (1:50)

Detailed plans showing existing layout, proposed works, dimensions and all relevant Building Control annotations.

Elevations & Sections (1:50/1:20)

External elevations and internal cross-sections showing heights, construction build-ups and materials.

Construction Details (1:10/1:5)

Enlarged details of critical junctions — eaves, verges, lintels, floor and wall junctions and window reveals.

Structural Element Notation

Beam, joist, rafter and column positions coordinated with your structural engineer specification.

Thermal & Insulation Schedules

U-value calculations and insulation specifications demonstrating compliance with Part L energy efficiency requirements.

Fire Strategy Notation

Fire compartmentation, means of escape, smoke detection and emergency lighting annotated in compliance with Part B.

How It Works

A clear, structured process from first contact to final delivery.

Design Information Review
01

Design Information Review

We review your planning drawings, structural engineer information and any existing survey data.

Technical Drawing Production
02

Technical Drawing Production

We produce the full technical drawing set in CAD, coordinating with your structural engineer specification.

Approval & Revision
03

Approval & Revision

Draft drawings shared with you, your builder and specialist consultants for review and revision.

Submission & Approval
04

Submission & Approval

We submit the full package to Building Control and manage any technical queries from inspectors.

Why Trust Apex Planning?

Over 15 years, 500+ projects and a 98% first-time planning approval rate. We prepare every application to the standard required to succeed — first time.

Our Guarantee

98% Approval Rate

Thorough preparation and local authority knowledge make the difference on every submission.

5–10 Day Turnaround

Fast, accurate drawing packages so your project keeps moving without delays.

Fixed Fees

One price agreed upfront. No surprises, no hidden extras, no upsells.

Free Revisions

Council amendments handled at no extra charge until you have your approval.

Common Questions

Frequently asked questions about our Building Regulations Drawings service.

Do I need Building Regulations approval if I have planning permission?

Yes — they are separate approvals. Planning covers the principle of what you build. Building Regulations covers how it is built: structural safety, fire safety, energy efficiency, drainage.

What is the difference between a Full Plans application and a Building Notice?

A Full Plans application involves submitting detailed drawings for approval before work starts. A Building Notice is a simpler route where the inspector checks compliance during construction.

Do I need a structural engineer?

For most structural work — removing walls, adding floors or significant extensions — structural engineer calculations are required. We coordinate with your structural engineer.

Ready to Start?

Start Your Building Regulations Drawings Project Today

Free consultation, fixed fees, and a quote within 24 hours.